Swimming Pool Leaks: What to Assess
A falling pool water level is not enough to identify a failed waterproofing layer.
ODS Construction Chemicals · Waterproofing information
What to record
A falling pool water level is not enough to identify a failed waterproofing layer. The shell, joints, pipework, fittings and operating conditions all need consideration. Record changes in water level and equipment operation, and share the pool construction and any previous repairs.
Before choosing a repair
The repair system must suit immersion, the substrate, joints and the proposed finish. Confirm how draining, preparation, curing and testing will be managed before agreeing a programme. Tile or grout renewal alone should not be assumed to resolve a leak through the underlying structure.
Discuss the scope
ODS Construction Chemicals focuses on waterproofing, supported by concrete repair, flooring and finishing. We also consider selected renovation and construction projects. Send the location, photographs and proposed scope to confirm whether we can take on your project. A guide is not a quotation or a promise of a particular method, product or completion date. Where a project proceeds, the written scope sets out the work and any warranty offered.
More on this from our guide library.
Water Tank Waterproofing: Questions Before Repair
A water-tank repair needs to distinguish leakage through the tank shell from problems at pipes, joints or fittings.
Read
Waterproofing Cost: What a Quote Should Cover
Waterproofing cost depends on the area, substrate condition, access and repair system.
Read
Related services
Got a project? Let's discuss.
WhatsApp ODSCC with a photo of your problem. If it's a project we can take on, we'll arrange a site visit.
Tell us what needs fixing.
WhatsApp us a photo of what's wrong. If it's a project we can take on, we'll arrange a site visit across the Klang Valley — no charge for the visit itself.
