Rainy-Season Building Checks
From safe, accessible positions, look for blocked drainage, standing water, damaged visible joints and new indoor stains.
ODS Construction Chemicals · Waterproofing information
What to record
From safe, accessible positions, look for blocked drainage, standing water, damaged visible joints and new indoor stains. Record changes after heavy rain. Ask building management to arrange checks of roofs, elevated façades and lift pits; these are not routine do-it-yourself access areas.
Before choosing a repair
Keep previous repair scopes and maintenance records available. Prioritise active water ingress, loose material and water near electrical equipment for appropriate professional attention. Maintenance may reduce avoidable drainage problems, but it does not replace assessment of a failed waterproofing system.
Discuss the scope
ODS Construction Chemicals focuses on waterproofing, supported by concrete repair, flooring and finishing. We also consider selected renovation and construction projects. Send the location, photographs and proposed scope to confirm whether we can take on your project. A guide is not a quotation or a promise of a particular method, product or completion date. Where a project proceeds, the written scope sets out the work and any warranty offered.
More on this from our guide library.
Related services
Got a project? Let's discuss.
WhatsApp ODSCC with a photo of your problem. If it's a project we can take on, we'll arrange a site visit.
Tell us what needs fixing.
WhatsApp us a photo of what's wrong. If it's a project we can take on, we'll arrange a site visit across the Klang Valley — no charge for the visit itself.
